Step-by-step payments for base prep, laying, and final finishing. Protect expensive materials with strict level-checking.

OR

Looking to buy materials only? Skip the labor and buy Wholesale Tiles and Marble directly from our Supply Network.

The Standard Work Flow

See exactly how BuildPilot manages, protects, and checks this specific work from the first estimate to the final handover.

Step 1: Base

Surface Preparation & Leveling

The contractor lays the raw cement mixture bed, ensuring correct water drainage slopes. Photos of the leveling tools are uploaded to check accuracy before any expensive tiles are touched.

Prep Check

Cement Bed Leveling

Slope Alignment

Verified Correct

Material

Base Cement Laid

Prep Phase:Released ✓
Step 2: Installation

Tile Laying & Skirting

The tiles or Italian marble slabs are permanently set. Spacers are used to ensure perfect joint lines. The heavy labor payment is released from the bank.

Execution

Tiles Set

Pattern

Owner Approved

Skirting

Fitted & Aligned

Laying Payment:Released ✓
Step 3: Finishing

Joint Filling & Polish

The joints are filled with color-matched cement, and (if needed) marble is machine-polished to a shine. You approve the final look, clearing the bank balance.

Completion

Surface Finished

Joint Lines

Sealed & Dried

Surface Polish

Final Check Passed

Final Payment:Cleared ✓